View all jobs
Project Scheduler (onsite)
14346 – Project Scheduler (onsite) – Juno Beach/ Jupiter West, FL
Start Date: ASAP
Type: Temporary Project
Estimated Duration: 12 months with possible extensions
Work Setting: 100% of the time at the Client's site. No telecommuting or remote work. This is a non-negotiable requirement from the client.
Only candidates able to relocate as required should apply to avoid removal from future consideration.
Our client is filling this contract position exclusively through approved staffing partners, so this opportunity is not available by applying directly with the client. If you're interested, we'd be happy to represent you throughout the hiring process.
20219 Required:
• Availability to work at the Client’s site in Jupiter West, FL (required)
• Scheduling experience in a nuclear, power generation, or heavy industrial environment (3-5 years)
• Experience with Primavera P6 or equivalent scheduling software.
20219 Responsibilities:
• Develops and maintains integrated project and outage schedules using Primavera P6 or equivalent scheduling tools.
• Coordinates with project managers and discipline leads to define activity sequences, durations, and resource loading.
• Establishes and maintains schedule baselines, monitors progress, and issues regular schedule performance reports.
• Integrates multi-discipline work packages into a cohesive schedule that accounts for plant operational windows, outage milestones, and regulatory hold points.
• Identifies critical path activities and near-critical float risks, developing recovery plans and contingency logic as needed.
19860/ 20280/20449/19858 Required:
• Availability to work at the Client’s site in Juno Beach, FL (required)
• Primavera P6 Scheduling software experience (4+ years)
• Bachelor’s Degree in Engineering, Construction, Business Management or similar field
19860/ 20280/20449/19858 Preferred:
• Scheduling experience (3+ years)
• Experience in Project Management with experience in tracking project plans against schedule baselines and performing ad-hoc analyses. (4+ years)
19860/ 20280/20449/19858 Responsibilities:
• Develops and maintains integrated project and outage schedules using Primavera P6 or equivalent scheduling tools.
• Coordinates with project managers and discipline leads to define activity sequences, durations, and resource loading.
• Establishes and maintains schedule baselines, monitors progress, and issues regular schedule performance reports.
• Integrates multi-discipline work packages into a cohesive schedule that accounts for plant operational windows, outage milestones, and regulatory hold points.
• Identifies critical path activities and near-critical float risks, developing recovery plans and contingency logic as needed.
• Responsible for the development of computerized critical-path schedules for day-to-day maintenance activities as well as for refueling and maintenance outages.
• Defines procedures, drawings, equipment and materials required to perform planned work packages.
Why apply?
• Gain experience with one of the world's largest solar and wind energy providers, which last year briefly became the most valued U.S. energy company;
• Work with a great team of professionals and learn newest technologies and approaches;
• Enjoy our Client’s wonderful campus with top-notch facilities for work and recreation;
• Benefit from multiple projects extensions;
• Receive support and advice from Vitaver consultants who are already working at our Client’s site;
• Get extra cash by participating in Vitaver Successful Completion Bonus Program;
• Always get paid in full and on time.
Start Date: ASAP
Type: Temporary Project
Estimated Duration: 12 months with possible extensions
Work Setting: 100% of the time at the Client's site. No telecommuting or remote work. This is a non-negotiable requirement from the client.
Only candidates able to relocate as required should apply to avoid removal from future consideration.
Our client is filling this contract position exclusively through approved staffing partners, so this opportunity is not available by applying directly with the client. If you're interested, we'd be happy to represent you throughout the hiring process.
20219 Required:
• Availability to work at the Client’s site in Jupiter West, FL (required)
• Scheduling experience in a nuclear, power generation, or heavy industrial environment (3-5 years)
• Experience with Primavera P6 or equivalent scheduling software.
20219 Responsibilities:
• Develops and maintains integrated project and outage schedules using Primavera P6 or equivalent scheduling tools.
• Coordinates with project managers and discipline leads to define activity sequences, durations, and resource loading.
• Establishes and maintains schedule baselines, monitors progress, and issues regular schedule performance reports.
• Integrates multi-discipline work packages into a cohesive schedule that accounts for plant operational windows, outage milestones, and regulatory hold points.
• Identifies critical path activities and near-critical float risks, developing recovery plans and contingency logic as needed.
19860/ 20280/20449/19858 Required:
• Availability to work at the Client’s site in Juno Beach, FL (required)
• Primavera P6 Scheduling software experience (4+ years)
• Bachelor’s Degree in Engineering, Construction, Business Management or similar field
19860/ 20280/20449/19858 Preferred:
• Scheduling experience (3+ years)
• Experience in Project Management with experience in tracking project plans against schedule baselines and performing ad-hoc analyses. (4+ years)
19860/ 20280/20449/19858 Responsibilities:
• Develops and maintains integrated project and outage schedules using Primavera P6 or equivalent scheduling tools.
• Coordinates with project managers and discipline leads to define activity sequences, durations, and resource loading.
• Establishes and maintains schedule baselines, monitors progress, and issues regular schedule performance reports.
• Integrates multi-discipline work packages into a cohesive schedule that accounts for plant operational windows, outage milestones, and regulatory hold points.
• Identifies critical path activities and near-critical float risks, developing recovery plans and contingency logic as needed.
• Responsible for the development of computerized critical-path schedules for day-to-day maintenance activities as well as for refueling and maintenance outages.
• Defines procedures, drawings, equipment and materials required to perform planned work packages.
Why apply?
• Gain experience with one of the world's largest solar and wind energy providers, which last year briefly became the most valued U.S. energy company;
• Work with a great team of professionals and learn newest technologies and approaches;
• Enjoy our Client’s wonderful campus with top-notch facilities for work and recreation;
• Benefit from multiple projects extensions;
• Receive support and advice from Vitaver consultants who are already working at our Client’s site;
• Get extra cash by participating in Vitaver Successful Completion Bonus Program;
• Always get paid in full and on time.